St.Bedes School was building a brand new, state of the art, performance centre for their students. As part of the build, the school required lighting, staging and a sound system to be installed in the main area of the hall.
THE CHALLENGES
– Due to the design of the building, custom made framework was required
– Additional consultation from the project management team to support the unique design
– Work was conducted around other construction companies working on the build
THE SOLUTION
FWD-IP worked closely with St.Bedes to ensure the new performance centre was fit for purpose for the students at the school. The custom framework and lighting/sound system enables the school to put on top quality productions for parents and students, in an environment that mirrors professional theatres.
“We are delighted with the level of service provided by FWD-IP. The team remained professional and courteous at all times and were generous with their help and advice.”